
Matting & Ground ProtectionPVCSKU IPM-C2G-060-10M
Heavy-Duty Roof Walkway Matting – R11 Slip Rated, Four-Way Drainage, UV Resistant | 14mm Loose-Lay PVC
Price shown updates with the option you pick.
The roof walkway for exposed roofs — four-way drainage, R11 grip, longer UV life, and it still comes up when the roof needs work.
Maintenance traffic is what damages flat roofs. Every visit to a plant unit, a solar array or an air-handling unit puts boots, ladders and toolboxes onto a membrane that was never meant to be walked on. This is the walkway that goes down first on a roof that gets the weather: an open-lattice PVC runner, 14mm high, laid loose along the access route so people walk on the matting and not the roof.
This heavy-duty grade is the upgraded version of our standard roof walkway matting. A redesigned base bar drains in four directions instead of two, so water never dams behind the run. A deeper-cut top bar lifts the slip rating from R10 to R11. The compound has improved UV weatherability, and the section is lighter at 5.8 kg/m² without giving up wind stability: it held to 125mph in laboratory testing. Choose light grey, white or yellow and a 0.6m, 0.91m or 1.22m wide 10m roll above.
FOUR-WAY DRAINAGE
The redesigned base bar lets water leave the walkway in every direction. Rain, dew and meltwater clear beneath it instead of ponding along the run, and the roof falls keep working.
R11 GRIP
Deeper-cut cross-directional top bars rated DIN 51130 R11, a full class above the standard grade, with V10 drainage so the tread stays clear in a downpour.
BUILT FOR EXPOSURE
Improved UV weatherability for roofs in full sun, service from -23°C to +60°C, and stable loose laid to 60mph with a 125mph laboratory rating. Phthalate free, resistant to most acids, alkalis and oils.
LOOSE LAY, NO FIXINGS
Nothing penetrates the membrane. Roll it out, cut to length on site, and lift or roll it back for inspection, recoating or re-roofing. The roofing guarantee is undisturbed.
HEAVY-DUTY OR STANDARD?
| Heavy-duty (this page) | Standard | |
|---|---|---|
| Slip resistance | DIN 51130 R11 | DIN 51130 R10 |
| Drainage | V10, four-way through the redesigned base bar | V10, two-way |
| UV weatherability | Improved compound for full-sun roofs | UV stabilised |
| Wind, laboratory | 125mph | 94mph |
| Weight | 5.8 kg/m² | 6.6 kg/m² |
| Colours | Light grey, white, yellow | Light grey, black, white, yellow |
| Choose it for | Exposed roofs, long service life, standing water, full sun | Internal wet floors, plant rooms, covered gantries, sheltered roof routes |
Rule of thumb: if the walkway is going onto an exposed roof and you want it still doing its job in ten years, this is the one. If it is going into a plant room or under cover, the standard grade is enough and comes in black as well.
WHICH ROOF IS IT FOR?
| PVC single-ply, felt, asphalt, mastic, concrete, metal deck | This mat. The R11 tread and four-way drainage make it the first choice on any exposed roof of these types. |
| TPO and EPDM single-ply | Take the TPO walkway matting instead. PVC in long-term contact with TPO or EPDM can mark the membrane. |
| Green or ballasted roofs | Ask. The route usually needs a paved or decked strip rather than loose-laid matting. |
| Not a roof at all | External gantries, stairs and high-level walkways, pontoons and jetties, wash-down bays. Anywhere a drained R11 route sits outside in the weather. |
HOW MUCH DO I NEED?
| 10m x 0.6m roll | Covers 6.0 m². About 35 kg. Single-file access route — hatch to plant, plant to plant, gutter runs, paths between panel rows. |
| 10m x 0.91m roll | Covers 9.1 m². About 53 kg. The general-purpose width — room to pass and to carry a toolbox. |
| 10m x 1.22m roll | Covers 12.2 m². About 71 kg. Two-way traffic, working platforms around plant, and areas where equipment is set down. |
| Planning the route | Measure from the access point to every item of plant that gets a visit. Add a working area at each unit — typically 1m deep by the width of the unit. Round up to whole rolls, and keep an offcut for under ladder feet and step platforms. |
| Worked example | Hatch to two air-handling units, 14m of route plus a 1m x 2m working area at each unit: 14m of 0.6m roll plus 4 m² of working area = three 0.6m rolls with 4m spare for the ladder and the outlet. |
| Cut lengths | Not listed here. Send us the lengths and we will price them cut to size. |
COLOURS
Three stock colours, the same mat and the same price in each. Use the colour selector above to see each one in place.
- Yellow — the usual choice on a roof. Reads as a marked route from a distance and in poor light, so contractors who do not know the roof follow it.
- Light grey — sits quietly against grey and white membranes and hides rooftop soiling between cleans.
- White — for reflective cool-roof membranes where the walkway should not read as a dark stripe from above.
Black is made in the standard grade only. Other colours are produced to order for larger projects.
JOINING, EDGING & ANCILLARIES
Everything on one page — matting accessories: ramp edging, snap track, connector clips, floor hooks and cold weld paste. This mat is 14mm, so take the 14mm snap track and the 14mm x 60mm ramp edging.
| End to end | Rolls butt together on the roof. On most routes that is all that is needed. Butt, never overlap: an overlap is a trip edge. |
| Connector clips | Dual-purpose 14mm clips, packs of 10. Join sections side to side or end to end where a run must stay as one piece — exposed corners, routes that contractors drag equipment along. |
| Snap track | 14mm two-part track, 2.5m lengths, for a flush permanent joint when rolls are laid side by side to cover a working platform. |
| Ramp edging | Not normally needed on a roof. Where a run meets a paved terrace or door threshold, fit 14mm x 60mm PVC ramp edging; one tube of cold weld paste per 10m. |
TYPICAL APPLICATIONS
- Exposed flat roof maintenance walkways and routes to air-handling units, chillers and plant decks
- Solar PV array access and inter-row maintenance paths
- Roof hatch and ladder landing zones, gutter and outlet inspection routes
- Gantries, external stairs and high-level walkways
- Pontoons, jetties and marina walkways
- Coastal and high-level sites where wind and UV shorten the life of ordinary matting
TECHNICAL SPECIFICATION
| Composition | Flexible polyvinyl chloride (PVC), phthalate free, UV stabilised with improved weatherability, non-porous |
| Construction | Two-layer welded open lattice — deep-cut cross-ribbed top bars over a redesigned four-way-draining base bar. One-piece flexible moulding |
| Height | 14mm (9/16") |
| Roll sizes | 10m x 0.6m (6.0 m²) | 10m x 0.91m (9.1 m²) | 10m x 1.22m (12.2 m²) |
| Tolerances | Height ±0.5mm | length 0 / +0.3m | width ±1cm. All dimensions nominal |
| Weight | 5.8 kg/m² (1.2 lb/sq.ft) |
| Colours | Light grey, white or yellow. Other colours to order |
| Slip resistance (DIN 51130) | R11 |
| Slip resistance (ASTM E303) | Dry/wet, with the lines–across the lines: 78–90 / 63–71 |
| Drainage (DIN 51130) | V10, four-way through the redesigned base bar |
| Wind resistance | Stable loose laid to 60mph (96 km/h). Laboratory flat-platform test to 125mph (200 km/h); ASTM D3161 125mph perpendicular and parallel |
| Fire | EN ISO 13501-1:2007 — Cfl-s1 |
| Service temperature | -23°C to +60°C (-9°F to +140°F). Slight size variation may occur at temperature extremes |
| Chemical | Resistant to most acids, alkalis and oils — ask for the chemical resistance sheet if you need a specific check |
| Hygiene | Non-porous PVC, naturally resistant to bacterial growth |
| Acoustic | Excellent sound absorption properties |
| Reversion | Allow up to 2% thermoplastic shrinkage when cutting to a fixed length; faster in hot locations |
| Fixing | Loose laid. No adhesive, no mechanical fixings, no penetration of the roof covering |
| Environment | 100% recyclable; contains no SVHC substances under REACH; phthalate free |
| BIM | Revit and IFC objects available on request |
FOR SPECIFIERS
Suggested clause: Loose-laid roof walkway matting, flexible PVC, two-layer welded open-lattice construction with four-way-draining base bar, 14mm high, 5.8 kg/m², slip resistance DIN 51130 R11, drainage DIN 51130 V10 four-way, reaction to fire EN ISO 13501-1 Cfl-s1, stable when loose laid to 60mph, service temperature -23°C to +60°C, phthalate free, REACH SVHC free, laid without adhesive or mechanical fixing. 10m rolls, [0.6 / 0.91 / 1.22]m wide, colour [light grey / white / yellow].
Tell us the roof type, the route length and the number of plant items and we will return a marked-up quantity, the data sheet and BIM objects for the model.
INSTALLATION
- Follow the route people actually take — hatch to plant, not wall to wall.
- Sweep first. Clear grit, loose fixings and debris from the route before unrolling.
- Lay it loose. Unroll and let it relax flat — it contours to the roof falls and over upstands. Nothing is fixed, screwed or bonded.
- Cut on site. A sharp knife through the bars. Cut slightly loose against an upstand to allow for reversion.
- Keep outlets clear. Never bury a rainwater outlet under a joint — break the run around it.
- Butt, do not overlap. Fit clips or snap track where a section must stay joined.
CLEANING & MAINTENANCE
Routine: hose it in place, or roll it up and jet-wash both the matting and the surface underneath. Non-porous PVC — nothing soaks in.
Annual: walk the route with the roof inspection, clear leaf litter from under the run, and re-lay any section moved by contractors.
After works: lift the mat where trades have been working, sweep out screws and swarf, and re-lay.
DOWNLOADS
- Technical data sheet (PDF, 2 pages) — covers the heavy-duty and standard grades side by side: sizes, tolerances, performance data, ancillaries, installation and cleaning.
- BIM objects (Revit / IFC) — available on request; tell us the project and we will send them over.
FREQUENTLY ASKED QUESTIONS
What is different about the heavy-duty grade?
Three things over the standard grade: a base bar that drains in four directions instead of two, a deeper-cut top bar that lifts the slip rating from R10 to R11, and a compound with improved UV weatherability. It is also lighter to handle at 5.8 kg/m² and rated to 125mph in laboratory wind testing.
Will it damage my roof membrane?
No — protecting it is the point. It is a flexible one-piece moulding laid loose, with no fixings and nothing sharp. On TPO or EPDM membranes use the TPO version.
Will it blow off?
It is stable loose laid in winds up to 60mph and held to 125mph on a flat platform in laboratory testing. For very exposed high-level roofs, tell us the site and we will advise on layout, clips or ballasting.
Does it come in black?
No. Black is made in the standard grade only. On a roof, yellow is the usual choice because it marks the route.
Is it safe when wet, icy or snowy?
Rain drains straight through the lattice in four directions and the deep-cut top bars give an R11 footing. It is designed to function down to -23°C. Snow and ice should be cleared from any roof walkway before use.
How do I cut it?
A sharp utility knife through the bars. Cut slightly loose against an upstand to allow for up to 2% reversion, or ask us to cut lengths before dispatch.
Do you have BIM objects and a data sheet?
Yes. The data sheet is in the Downloads section above; Revit and IFC objects are sent on request.
NOT SURE WHAT YOU NEED?
Send us the route length, the membrane type and whether the roof is exposed. We will specify the grade, the width, the colour and the number of rolls, and price any clips or edging the run needs.
Product details
| SKU | IPM-C2G-060-10M |
|---|---|
| Material | PVC |
| Form | Mat |
More from this range
Request a quote
Fast, no-obligation price from our UK team for:Heavy-Duty Roof Walkway Matting – R11 Slip Rated, Four-Way Drainage, UV Resistant | 14mm Loose-Lay PVC